Projects

Mitchell’s fruit Farms Limited

  • M/S Pak Green laboratories has provided the technical assistance for the operation of ETP
  • After achieving the compliance of section-11 of PEPA 1997 (Amended 2012) the Pollution charges was evacuated by honorable PET against M/s Mitchell’s Fruit Farms Limited.
  • Pak Green Laboratories has made agreement for 1 year regarding the technical supervision of ETP and wet Scrubbing system.

M/S DHA (EME,MOC)

  • Pak Green Enviro-Engineering has conducted the baseline Environmental studies.
  • Pak Green has prepared Environmental Impact Assessment Report for the installation of Grid station in the DHA projects.
  • Pak Green Laboratories conducting Environmental Monitoring.

M/S Tetra Pack (Pakistan) Limited

  • Pak green has conducted the annual compliance report for M/S Tetra pack.
  • Pak green has gotten the responsibility of preparing Annual audit reports for the Tetra pack.
  • Pak Green Laboratories has served Tetra pack in monitoring of air, water and noise.

M/S Honda Atlas

  • Pak green Compliance section has dealt the Defiance reports of the Honda Atlas
  • Pak Green has prepared an Environmental management Plan for the proponent
  • PakGreen Laboratories has provided the technical assistance for the monitoring on Annual Basis.

M/S Sunder Industrial Estate

  • Team PakGreen has served the Industrial Estate in the waste water flow rate calculation.
  • Pak green is serving Industrial estate since long time.

M/S Rafhan Maize Co. Ltd

  • Pak Green has conducted baseline Environmental Study for Rafhan Maize.
  • Initial Environmental Examination Report of Coal Fired Power Plant and facilitation in securing Environmental.
  • Environmental Monitoring by Pak green laboratories.

M/S Dalda Foods Pakistan

  • Baseline Environmental Study conducting by the Pak Green EIA/IEE
  • Preparation of environmental impact assessment report and submitting case into the EPA
  • Facilitation and follow up for securing Environmental
  • Providethe firefighting and occupational health and safety plan and design waste water treatment

M/S KnN’s

  • Baseline Environmental Study for the EIA by the Pak green.
  • Preparation of more than five Initial Environmental Examination (IEE) of the poultry projects including JP, Breeders, Layer Farms.
  • Facilitation in the compliance matters of the projects for 5 years.
  • Pak Green Laboratories conducting Environmental Monitoring.

M/S Sapphire Textile Mills

  • InitialEnvironmental Examination Reports of extension units and facilitation in securing Environmental
  • Pak Green Environmental Monitoring is conducted by our team on monthly basis.

M/S DADA Enterprises (Tannery), Kasur

  • Pak Green EIA/IEE section has facilitated the Dada Enterprises in securing Environmental Approval for operational Phase from EPA under NOC DD(EIA)/EPA/F- 34(EIA)/2K/10/Cir/498 Dated: 13.07.2011.
  • Pak Green Laboratories has been conducting Environmental monitoring on monthly bases since 4 years
  • PakGreen Laboratories section provides the technical super vision for the operation and maintenance of the ETP at M/s Dada

Ghani Global Gases KPK

  • Baseline Environmental Study of two projects were conducted by the Pak Green EIA/IEE
  • Preparation of environmental impact assessment report and submitting case into the EPA
  • Facilitation and follow up for securing Environmental Problems.
  • Pak Green Laboratories served the group in Environmental monitoring.

World Bank Funded Projects of The Govt. Of Punjab

  • Ambient air monitoring with mobile Horriba monitors, during the construction/repair of eighteen roads in Rawalpindi Division during the year.
  • Waste and drinking water analysis of WASA Rawalpindi.
  • Ambient air monitoring with mobile Horriba monitors, during the construction/repair of fourteen roads in Faisalabad Division during the year.
  • Ambient air monitoring with mobile Horriba monitors, during the construction/repair of twenty seven roads in Lahore Divisions during the year.
  • upcoming project of above mention category have been awarded to M/s Pak Green, for the year 2015.

M/S Nishat Mills Pvt. Ltd

  • PakGreen Laboratories hasfive year agreement with Nishat Chunian for environmental
  • Pak Green Engineering section has provided the facility and assistance to the Nishat Chunian management for the Hazardous/Risk assessment and mitigation
  • Execution of Environmental approvals of three extension unit and power plants by submitting environmental assessment
  • Approvals were granted under Letter DD(EIA)/EPA/F
  • 133(IEE)/2014/964 Dated: 03.06.2014 & second one was DD(EIA)/EPA/F-134(IEE)/2014/1906 Dated: 07.05.2014

M/S NIPPON Paints, Pakistan

  • Pak Green EIA section has facilitated, follow up and secured Environmental NOC in favor of M/S NIPPON Pakistan Under section-14 for the handling and storage of the hazardous chemicals under letter DD(EIA)/EPA/F-802/2007/616 Dated: 22.09.2010
  • Quarterly monitoring and submitting the Compliance audited report in the EPA
  • Occupational health and safety assessment at the Nippon project site and provide them mitigation measure.
  • Conducting the WORKSHOPs, training sessions for awareness at NIPPON PAINT project site by Pak GREEN expert trainees in occupational health and safety field.

M/S Coca Cola

  • Baseline study of project at the Heripur Hazara KPK .
  • Pak Green Laboratories has been sampled Ground water and testing of the project site at Dengue
  • Soil and vegetation status of the project
  • Ambient air monitoring of the project site with HORRIBA for 24
  • PM monitoring of the proposed study area before the project
  • Pak Green Conducted the Socio-Economic survey of the Heripur Hazara in favor of Coca Cola.
  • Pak green has conducted the annual compliance report for M/S Coca Cola.
  • Pak green has gotten the responsibility of preparing Annual audit reports for the M/s Coca Cola.

M/S PEPSI Gujranwala

  • Environmental monitoring and compliance report
  • Provide Engineering Design for the steam boiler
  • Pak Green Engineering Section has been installed the scrubbing system on the boiler to control the gases emissions and PM for the compliance of NEQs.

EIA – IEE Projects

  • EIA of Construction of Lucky Cement Limited Dara Pezu, Lakki Marwat
  • EIA for Construction of Choco Pie (Biscuit) Unit of Lotte Kolson Ltd.
  • EIA for the Operational Phase of Office, Hanger Hall & Godown of DADA Enterpries Ltd.
  • EIA for Operational Phase of Water and Solvent Based Paint Manufacturing Unit of Nippon Paint Pvt. Ltd.
  • EIA for Operational Phase of Dairy Farm of DADA Dairies Limited.
Read More!

Laboratory Projects

  • Zephyr Textile
  • Jotun Paint.Ltd
  • Nippon Paint Pakistan
  • Dada Tanneny
  • Fast Cables Ltd
  • Firhaj Footwear Ltd
Read More!

Engineering Projects

  • 25 m3/h sitara Chemical Industries Ltd Faisalabad
  • 50 m3/h faisal Fabric Pvt Ltd Faisalabad
  • 500 m3/d Omer Jibran Engineering Industries
Read More!